Hotel corridor mid-renovation with exposed conduit and junction boxes visible in ceiling
Hotel Electrical Diagnostics

How Much Is Your
Hotel's Wiring
Costing You?

Enter your hotel's city or zip code to begin a free electrical risk diagnostic — no commitment, just clarity.

Code-Compliant Rewiring
Occupied-Floor Safe
Inspection-Ready
Scroll
Every Hotel Has Hidden Electrical Debt

Drag the slider.
Then audit your own property.

Each scenario below is a real condition we've found in occupied hotels. How many does yours match?

Scenario 01 — Guest Room

The wiring your guests sleep three feet from

Knob-and-tube from 1962 behind drywall. No ground. No arc-fault protection. One overloaded circuit serving every outlet, the HVAC, and the card-key lock.

BeforeKnob-and-tube, ungrounded, no AFCI
AfterMC cable, labeled circuits, AFCI protected
higher fire risk with ungrounded circuits
$0
insurance payout on ungrounded claims
48 hrs
typical guest room rewire timeline
Tangled knob-and-tube wiring in hotel wall cavity showing outdated electrical system
Before
Clean labeled MC cable runs in hotel wall cavity after professional electrical rewiring
After
← Drag to compare →
Scenario 02 — Commercial Kitchen

A 200-amp panel doing the work of 400

Six commercial ranges, a walk-in, three hood fans, and a dishwasher all sharing a panel that was sized for a 1980s diner. Breakers trip during every Saturday service.

BeforeUndersized panel, shared circuits, tripping breakers
AfterDedicated circuits, proper ampacity, labeled panel
revenue lost per tripped breaker during service
400A
minimum for a full-service hotel kitchen
100%
dedicated circuits required per NEC 210.52
Commercial kitchen with overloaded electrical panel and tripping breakers during service
Before
Properly sized commercial kitchen electrical panel with dedicated labeled circuits
After
← Drag to compare →
Scenario 03 — Main Distribution

The panel your fire marshal is looking at

Double-tapped breakers. Unlabeled circuits feeding unknown loads. A bus bar with visible carbon scoring. This is what a failed inspection looks like — before the re-inspection fee.

BeforeDouble-tapped, unlabeled, carbon-scored bus
AfterSingle-pole, labeled, load-balanced riser
$2,400
avg re-inspection fee per failed panel
72 hrs
to remediate and re-schedule inspection
100%
of our panels pass first re-inspection
Hotel main electrical distribution panel with double-tapped breakers and unlabeled circuits
Before
Replaced hotel main distribution panel with properly labeled single-pole breakers and load balancing
After
← Drag to compare →
5-Question Electrical Diagnostic

Know your property's
electrical risk score.

Answer five questions. Get a personalized risk tier and recommended scope of work delivered to your inbox.

Question 1 of 5
Q1 / 5

When was your property originally built?

Building age is the #1 predictor of electrical risk tier.

Historic hotel exterior showing building age context for electrical assessment
From the Field

Hotel operators who
stopped guessing.

Real outcomes from real properties. Names, room counts, and results — because specificity is how you know it's not marketing copy.

"
We failed our fire marshal inspection in March — double-tapped breakers on floors 3 through 7, unlabeled circuits feeding the HVAC units. Conduit had us re-inspection ready in 11 days without a single guest complaint. Every wire labeled, every junction boxed.
Passed re-inspection in 11 days
Marcus Delacroix, General Manager of The Alderton Boutique Hotel in Denver
Marcus Delacroix
General Manager, The Alderton Boutique Hotel
Denver, CO·94 rooms
"
Three years of Saturday kitchen shutdowns — breakers tripping mid-service because the panel was sized for a 1983 diner, not a 200-seat restaurant. Conduit replaced the distribution panel on a Monday and Tuesday. We've run 47 consecutive weekend services without a trip.
47 consecutive service weekends, zero trips
Priya Venkataraman, Director of Operations at Harborview Suites and Conference Center in Portland
Priya Venkataraman
Director of Operations, Harborview Suites & Conference Center
Portland, OR·218 rooms
"
Breaking ground on a 140-room boutique property — I needed a contractor who understood the difference between a ballroom dimmer circuit and a card-key switch. Conduit delivered a full riser diagram and panel schedule before our GC poured the foundation. That's the level of coordination this industry needs.
Full riser diagram delivered pre-foundation
Tobias Renner, Principal Developer at Renner Hospitality Group in Austin
Tobias Renner
Principal Developer, Renner Hospitality Group
Austin, TX·140 rooms
340+
Hotel properties rewired
98%
First re-inspection pass rate
0
Guest evacuation incidents
48 hrs
Average guest-room turnaround
Hotel electrical panel room showing main distribution board and conduit runs
Free Diagnostic — No Commitment

Get your hotel's
electrical score.

A personalized risk tier, recommended scope of work, and complimentary inspection checklist — delivered to your inbox. Takes 3 minutes.

01

Complete the 5-question diagnostic

3 minutes
02

Receive your electrical risk score

Delivered to your inbox
03

Review your recommended scope

From a licensed project engineer
Licensed & Insured in 12 States
NECA Member Contractor
IBEW Signatory
24-hr Emergency Response